The Montmartre funicular renovated by LST

Montmartre funicular, very early during the night of 19th October. Cabin and lorry are going in the south of France to be controled and renovated for RATP, in charge of all subways and elevators in Paris. The vehicle will be back on the track in 5 weeks ...

  • Watch the impressive video of the cab handling system here
  • Watch the funicular cab transport video here
P_20171019_051014_LL Yammer     P_20171018_180528 Yammer     Capture d’écran 2017-10-24 à 15.52.57